CAMERON PARISH POLICE JURY
NOTICE OF PUBLIC MEETING
AGENDA – VOTING SESSION
THURSDAY, JANUARY 7, 2021
2:00 P.M.

Cameron Parish Police Jury
West Annex – Board Room
148 Smith Circle, Cameron, LA

  1. Call to Order
  2. Pledge of Allegiance/Prayer
  3. PUBLIC COMMENT
  4. Approval of Minutes
  5. Election of President
  6. Election of Vice-President
  7. Appointment of Parish Secretary
  8. Appointment of Interim Tax Assessor
  9. Approval of Add-Ons:
  10. Other Permits:
    a. Port Arthur Pipeline, LLC – Near Sabine Lake, Section 36 & 31, T11S-R13W, Section 33, T11SR12W, Section 22, 23, & 13, T11S-R11W, Section 7 & 8, T11S-R10W, (proposed 33 geotech boring locations needed for Port Arthur Pipeline LA Connector Project to gather data on subsurface conditions for final design), Cameron Parish, LA. (210101)
    b. ANR Pipeline Company – Grand Chenier, Section Section 4 & 5, T15S, R6W, (proposed Grand Chenier XPress Project post hurricane disturbance restoration that included retrieval of offsite materials outside the permitted project as a result of Hurricane Laura), Cameron Parish, LA. (210102)
    c. Austin Gautreaux – Hackberry, Sam Breaux Rd., Section 36, T12S, R10W, (proposed water/boat access to fishing camps that consist of dredging canal measuring (250′ x 30′ x 7′), two (20′ x 20′) boat stalls with elevated walkways, deposition of unauthorized fill material from previous landowner, approx. 328.8 cubic yards, and construction of two fishing camps), Cameron Parish, LA. (210103)
    d. TransCameron Pipeline, LLC – Cameron and Grand Chenier Areas, (proposed Post-Hurricane Item Retrieval of timber mats, drums, and tanks due to storm-surge associated with Hurricane Laura/Delta, all work is currently authorized under EUA 20-069-01), Cameron Parish, LA. (210104)
    e. Venture Global Calcasieu Pass, LLC – Cameron Area, (proposed Post-Hurricane Item Retrieval of connex containers, tanks, drums, and miscellaneous debris that were carried by floodwaters beyond the authorized construction workspace for the Calcasieu Pass Terminal Project during Hurricane Laura, all work is currently authorized under EUA 20-069-01), Cameron Parish, LA (210105)
    f. Patrick K. Hebert – Grand Chenier, Section 45, T15S, R5W, (proposed (C&D) construction and demolition disposal site for Hurricane Debris related to Laura and Delta, all work is authorized under EUA 20-073; proposed after-the-fact application to utilize an approx. 4-acre pond as a debris disposal area which resulted from hurricanes Laura and Delta with an area east of the disposal area utilized as a staging site that encompasses approx. 2.85 acres. Additionally, approx. 1.2 acres adjacent east of the proposed disposal area was previously used for debris disposal from Hurricane Ike), Cameron Parish, LA. (210106)
    g. George Wendell Wilkerson II – Cameron Site, Section 65, T14S, R9W, (proposed (C&D) construction and demolition disposal site for Hurricane Debris related to Laura and Delta, all work is authorized under EUA 20-077; proposed after-the-fact application of excavation/filling of approx. 510,000 cubic yards on 14 acres of existing and new processing and disposal areas for C&D. Additionally, this site was utilized in the past for debris disposal for Hurricane Rita), Cameron Parish, LA. (210107)
    h. Myers Trucking and Equipment, LLC – Sweetlake, Section 24, T12S, R8W, (proposed (C&D) construction and demolition disposal site for Hurricane Debris related to Hurricane Laura, all work is authorized under EUA 20-076; proposed after-the-fact application of excavation/filling of approx. 322,666 cubic yards on 40 acres of new processing and disposal areas for C&D), Cameron Parish, LA. (210108)
    i. George Wendell Wilkerson II – Sweetlake Site, Section 17, T12S, R7W, (proposed debris burial site for vegetative and (C&D) debris related to Hurricane Laura and Delta, all work is authorized under EUA 20-071; proposed after-the-fact application of excavation/filling of approx. 217,500 cubic yards on approx. 6-acre disposal site), Cameron Parish, LA. (210109)
    j. Romero Landfill, LLC – Johnson Bayou, Section 30 & 31, T15S, R13W, (proposed (C&D) construction and demolition disposal site for Hurricane Debris related to Hurricane Laura, all work is authorized under EUA 20-072; proposed after-the-fact application of excavation/filling of approx. 153,266 cubic yards on 10-acres of existing and new processing and disposal areas for C&D. Additionally, this site was utilized in the past for debris disposal for Hurricanes Rita and Ike), Cameron Parish, LA. (210110)
  11. Appointments:
    a. Beachfront Development District No. 1 – JoElla Bott, resigned
    b. Mosquito Abatement Control Board – Nathan Griffith, resigned
  12. President Authority to Sign CEA with SWLAHEC to staff Cameron Parish Health Unit through December 2021
  13. President Authority to Sign Amended CEA with the office of the Coroner East Baton Rouge Parish for autopsy services
  14. President Authority to Sign Letter of Support for the Calcasieu Sabine Large Scale Marsh and Hydrologic Restoration (CS-87)
  15. Proclamation – Kelly Cloud
  16. Proclamation – Bobby Joe Doxey
  17. Consideration of Variance request for Canik’s Feed & Grocery, 4459 West Creole Highway, Cameron, LA 70631 (Tabled from last month)
  18. Authority to advertise for RFQ for MIT Mermentau Basin Project (KB)
  19. Pay Bills

Adjourn Meeting
* Indicating Add-ons

View the official document