CAMERON PARISH POLICE JURY
NOTICE OF PUBLIC MEETING
AGENDA – VOTING SESSION
THURSDAY, DECEMBER 10, 2020
2:00 P.M.

Cameron Parish Police Jury
West Annex – Board Room
148 Smith Circle, Cameron, LA

  1. Call to Order
  2. Pledge of Allegiance/Prayer
  3. PUBLIC COMMENT
  4. Approval of Minutes
  5. Approval of Add-ons:
  6. Drilling & Pipeline Permits:
    a. Hilcorp Energy Company – Grand Chenier Field, Section 1, T15S, R5W, (proposed flowlines to serve the M.O. Miller No. 3 Wellsite), Cameron Parish, LA. (201203)
    b. Hilcorp Energy Company – Grand Chenier Field, Section 1 & 12, T15S, R5W, (proposed flowlines to serve the Moise Sturlese No. 1 Wellsite), Cameron Parish, LA. (201204)
    c. Blue Marlin Offshore Port, LLC – Johnson Bayou Area, Lat 30 0 7.83, Long -93 59 42.87, (proposed installation of 42-inch Crude Oil Pipeline starting at Nederland Terminal facility), Cameron Parish, LA. (201205)
  7. Other Permits:
    a. LBH, LLC – Grand Lake Area, Intracoastal Waterway, Lat 30 0 35.41, Long -93 13 40.39, (proposed emergency use authorization to install fiber optic telecommunications utility cable to replace lines damaged in recent storm event; EUA 20-096), Cameron Parish, LA. (201201)
    b. James Brian and Sharon Dearing Allen – Holly Beach, Riviera Ln., Section 10 & 11, T15S, R11W, (proposed to haul-in fill material to low areas on property to construct a 34 ft. x 30 ft. camp), Cameron Parish, LA. (201202)
    c. Gravity Drainage District No. 4 – Creole, Section 27-29, T14S, R7W, (proposed to perform maintenance dredging along 16,141 linear feet of drainage lateral known as Snake Bayou), Cameron Parish, LA. (201206)
    d. Gravity Drainage District No. 4 – Oak Grove Area, Section34-36, T14S, R7W, Section 31, T14S, R6W, (proposed to perform maintenance dredging along 16,970 linear feet of drainage lateral “A”), Cameron Parish, LA. (201207)
    e. Roy Bailey Construction, Inc. – Trosclair Rd, Sections 4 & 5, T15S, R8W, (proposed Hurricane debris disposal/borrow pit reclamation of two (2) borrow pits; disposal and backfilling of hurricane debris, wood waste, and C&D will be utilized for reclaiming the impoundments to prevent further unnecessary damage), Cameron Parish, LA. (201208)
    f. BP Remediation Management – W. Hackberry, Section 25, T12S, R11W, (proposed to plug and abandon JP Watkins #9 well (SN49420), Cameron Parish, LA. (201209)
    g. Gravity Drainage District No. 4 – N East Creole, Sections 15-17, T14S, R7W, (proposed to perform maintenance dredging along 3,554 linear feet of drainage lateral “L”), Cameron Parish, LA. (201210)
    h. Gravity Drainage District No. 4 – Creole Canal, Sections 4,5,8,17,20,29,32, T14S, R7W, Sections 5,8,9, T15S, R7W, (proposed to perform maintenance dredging to cleanout 38,084 linear feet of canal running parallel to State Hwy 27), Cameron Parish, LA. (201211)
    i. Gravity Drainage District No. 4 – Hwy 27/West Creole Hwy, Sections 26-27, T14S, R8W, (proposed to perform maintenance dredging along 7,900 linear feet of lateral cleanout running parallel to State Hwy 27), Cameron Parish, LA. (201212)
    j. Entergy Louisiana, Inc. – Hackberry Area, (proposed emergency use authorization to repair/replace ninety-seven (97) utility line support structures (poles) necessary to restore loss of power to customers and correct a potential safety hazard; EUA 20- 103), Cameron Parish, LA. (201213)
    k. Gravity Drainage District No. 4 – N East Creole, Section 20, T14S, R7W, (proposed to perform maintenance dredging along 1,230 linear feet of drainage lateral “Q”), Cameron Parish, LA. (201214)
    l. Gravity Drainage District No. 4 – S East Creole, Sections 20 & 21, T14S, R7W, (proposed to perform maintenance dredging along existing drainage lateral “F”), Cameron Parish, LA. (201215)
    m. Gravity Drainage District No. 4 – Oak Grove Area, Section 31 & 32, T14S, R7W, (proposed to perform maintenance dredging along 6,880 linear feet of drainage lateral “M”), Cameron Parish, LA. (201216)
    n. Gravity Drainage District No. 4 – Creole, Sections 2 & 3, T14S, R8W, Sections 17 & 18, T14S, R7W, (proposed to perform maintenance dredging along 6,964 linear feet of drainage lateral “P”), Cameron Parish, LA. (201216)
    o. Chevron – Johnson Bayou, Lat 29 45 46.80, Long -93 52 58.47, (proposed Sabine Pass Geotechnical Exploration; complete geotechnical borings to obtain engineering and design information based on existing subsurface conditions necessary to appropriately design the shoreline repair component of the restoration marsh creation plan), Cameron Parish, LA. (201217)
    p. Gravity Drainage District No. 4 – S Little Chenier, Section 17, T14S, R6W, (proposed to perform maintenance dredging along 4,147 linear feet of drainage lateral “K”), Cameron Parish, LA. (201218)
  8. Approve Meeting Schedule for 2021
  9. Approve Holiday Schedule for 2021
  10. Approve Budget Amendments for December 2020
  11. Adopt Cameron Parish Police Jury Budget for Year Ending December 31, 2021
  12. Accept Bids for 2021:
    a. Dust Control
    b. Limestone
    c. White Goods
  13. President Authority to sign Cooperative Endeavor Agreement with the Office of the Coroner East Baton Rouge Parish to replace our agreement with Calcasieu Parish for autopsy services
  14. President Authority to sign Cooperative Endeavor Agreement to receive disaster funding from the Louisiana Department of Treasury
  15. President Authority to sign Resolution adopting the Narrative and the Language Access Plan for Title VI Civil Rights Act
  16. Accept proposal and grant authority to Parish Administrator to execute contract for Architectural Services relative to FEMA DR-4559 and FEMA DR-4570 projects
  17. Consideration of Variance for Canik’s Feed & Grocery, 4459 West Creole Highway, Cameron, LA 70631
  18. President Authority to sign Resolution of Support of the Southwest Coastal Study allocation of construction funding
  19. Proclamation – Darrell Williams
  20. Pay Bills

Adjourn Meeting

View the official document